Thursday 18 October 2012

Production Schedule



Production Schedule


The pitch is to be completed on the 21st of September by Ryan, it consists of the audience reviews given to the group when it presents its initial idea of the film. The class will give criticisms and positive points on the group’s presentation.

When it comes to the proposal is due on the 21st of September, it is a synopsis of the story of the film.

The treatment is a detailed breakdown of the shots, light, sound and camera use, the purpose of it, is to develop and have a clear idea of the production of the film for each scene. The treatment is to be completed by 21st September by Ibifuro.

The audience profile, is a document which represents the typical audience that would watch our film, this document helps the group to focus on the target audience chosen for this film. This is due on 21st September by Ryan.

When it comes to the resources of mise-en-scene, it is due on the 21st of September by Ryan. Its main purpose is to have a clear idea of the setting of the film. This document also helps to identify the props and the use of locations.

The textual analysis is to be written by each member of the group, and due on the 21st of September. Its main purpose is to watch and analyse a film which reflects on the genre and story line of the film the group is creating. The textual analysis focuses on the representation of the characters, mise-en-scene, and on the structure of the film such as the equilibrium and disequilibrium.

The shot list is a table that contains the caption, of shot sizes and camera movement, this is due on the 28th of September.

The story board is a detailed drawing of all the shots that are going to be used in the shooting process of the film and this is due on the 5th of October.

When it comes to the annotation of the film review, the layout is to be taken into consideration when annotating the film reviews. Such as, where the ratings are placed, how much space the title takes on the page article and how much has been written about the storyline and the cast. And this is due on the 5th of October.

The annotation of film review consists of annotating the content, such as, what the editor is writes about in the review and this is due on the 5th of October.

The draft of the poster is a hand drawn version which consists of the age limit, title, and the tag line and this is due on the 28th of September.

The script is to be due on the 28th September; it consists of writing the dialogue that will take place during the film.

The production schedule is about writing the documents deadlines and the purposes of them. This is due on the 5th of October.

The recce report consists of all the pictures taken from the locations that will be used in our film. This is due on the 5th of October.

The short film rough cut is to be done on the 2nd of November and it is a rough and first copy of our film.

The draft magazine review page is a review written by the team including rates, the cast, title, and storyline. This is due 9th November.

The final draft poster is due on the 16th of November, this is the last draft of the poster.

The first draft of evaluation is due on the 16th of November, this is an overall evaluation of the overall project. However, the final draft of the evaluation is due on the 23rd November.

The 2nd cut of short film due on the 23rd November, this is an improved version of the rough cut.

The final draft magazine page is due on 30th of November, this is the last draft of the magazine page.

The final cut of short film is due on the 7th of November, this is the last and improved version of the short film.

The final draft of the evaluation is due on the 14th December and this is the last draft of the evaluation.