The pitch is to be
completed on the 21st of September by Ryan, it consists of the
audience reviews given to the group when it presents its initial idea of the
film. The class will give criticisms and positive points on the group’s
presentation.
When it comes to the
proposal is due on the 21st of September, it is a synopsis of the
story of the film.
The treatment is a detailed
breakdown of the shots, light, sound and camera use, the purpose of it, is to
develop and have a clear idea of the production of the film for each scene. The
treatment is to be completed by 21st September by Ibifuro.
The audience profile, is a
document which represents the typical audience that would watch our film, this
document helps the group to focus on the target audience chosen for this film.
This is due on 21st September by Ryan.
When it comes to the
resources of mise-en-scene, it is due on the 21st of September by
Ryan. Its main purpose is to have a clear idea of the setting of the film. This
document also helps to identify the props and the use of locations.
The textual analysis is to
be written by each member of the group, and due on the 21st of
September. Its main purpose is to watch and analyse a film which reflects on
the genre and story line of the film the group is creating. The textual analysis
focuses on the representation of the characters, mise-en-scene, and on the
structure of the film such as the equilibrium and disequilibrium.
The shot list is a table
that contains the caption, of shot sizes and camera movement, this is due on the
28th of September.
The story board is a
detailed drawing of all the shots that are going to be used in the shooting
process of the film and this is due on the 5th of October.
When it comes to the
annotation of the film review, the layout is to be taken into consideration
when annotating the film reviews. Such as, where the ratings are placed, how
much space the title takes on the page article and how much has been written
about the storyline and the cast. And this is due on the 5th of
October.
The annotation of film
review consists of annotating the content, such as, what the editor is writes
about in the review and this is due on the 5th of October.
The draft of the poster is a
hand drawn version which consists of the age limit, title, and the tag line and
this is due on the 28th of September.
The script is to be due on
the 28th September; it consists of writing the dialogue that will
take place during the film.
The production schedule is
about writing the documents deadlines and the purposes of them. This is due on
the 5th of October.
The recce report consists
of all the pictures taken from the locations that will be used in our film.
This is due on the 5th of October.
The short film rough cut is
to be done on the 2nd of November and it is a rough and first copy
of our film.
The draft magazine review
page is a review written by the team including rates, the cast, title, and
storyline. This is due 9th November.
The final draft poster is
due on the 16th of November, this is the last draft of the poster.
The first draft of
evaluation is due on the 16th of November, this is an overall
evaluation of the overall project. However, the final draft of the evaluation
is due on the 23rd November.
The 2nd cut of
short film due on the 23rd November, this is an improved version of
the rough cut.
The final draft magazine
page is due on 30th of November, this is the last draft of the
magazine page.
The final cut of short film
is due on the 7th of November, this is the last and improved version
of the short film.
The final draft of the
evaluation is due on the 14th December and this is the last draft of
the evaluation.